News‎ > ‎News‎ > ‎

Field test(Sorok bridge)

posted Jul 17, 2016, 11:26 PM by chunguang kang   [ updated Aug 9, 2016, 2:55 AM by 정웅희 ]

In order to identify structural characteristics to external loadings, static and dynamic loading tests were performed on 7.12~7.16, 2016. Several displacement transducers, accelerometers and strain gauges were installed on the deck to capture the responses of the bridge. Camcorder was also installed to check the location of the traveling vehicle.

Comments